CONTENTS:
| S.No. | Name of Agency & address | Title |
| 1 | The Executive Engineer, UIT, Kota | Rigid Pavement Design Mala Road |
| 2 | M/s Punj Lloyd Limited, Chittorgarh | Design of Rockfill Embankment NH-76 |
| 3 | M/s S. S. & Sons, Malviya Nagar, Jaipur | SBC |
| 4 | M/s HCC Ltd., C/o Stanley Rites, Chittorgarh | Fly Ash Embankment Design |
| 5 | M/s Ugrsen Gupta, Engineers & Contractors, Kota | SBC (OHSR) Dungarja, Digod |
| 6 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing RCC-OHT 100KL |
| 7 | M/s Gajendra Agarwal, Vaishali Nagar, Ajmer | Proof Checking of Design & Drawing RCC-CWR 1500KL |
| 8 | M/s Triveni Enterprises, Kota | Proof Checking of Design & Drawing GLSR 145KL |
| 9 | The Executive Engineer, PHED Division, Jhalawar | Use of PCC for Water Retaining/ Building work |
| 10 | M/s Triveni Enterprises, Kota | Mix Design M-25 grade concrete |
| 11 | M/s Punj Lloyd Limited, Chittorgarh | Proof Checking of Design of minor bridges at ch.343.730 |
| 12 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing of RCC-CWR 120KL |
| 13 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing of RCC-OHT 390KL |
| 14 | The Executive Engineer, PHED Division, Ramganjmandi | Rehabilitation of RCC-OHT 130KL at Khairabad |
| 15 | The Executive Engineer, PHED Distt Rural Dn., Kota | SBC of RCC-OHT 225KL at Char Chouma |
| 16 | M/s Prem Construction Co., Jaipur | SBC of RCC-OHT 10.50KL at Swami Vivekanand Nagar |
| 17 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing of RCC-CWR 100KL |
| 18 | M/s Shri Ram Construction Group, Kota | Proof Checking of Design & Drawing of RCC-OHT150KL |
| 19 | M/s Laxmi Nath Infrastructure (Pvt) Ltd., Churu | Mix Design M-40 grade Concrete |
| S.NO. | NAME OF CONSULTANCY |
| 1 | CONCRETE TECHNOLOGY |
| 2 | STRUCTURAL DESIGN AND DRAWING |
| 3 | SOIL & GEOTECHNICAL ENGINEERING |
| 4 | SURVEY AND FIELD ENGINEERING |
| 5 | ENVIRONMENTAL & WATER MANAGEMENT SCHEME |
| S.NO. | NAME OF TESTS |
| 1 | NATURAL MOISTURE CONTENT |
| 2 | SPECIFIC GRAVITY |
| 3 | LIQUID LIMIT; PLASTIC LIMIT & PLASTIC INDEX |
| 4 | SHRINKAGE LIMIT |
| 5 | SIEVE ANALYSIS |
| 6 | HYDROMETER TEST FOR GRAIN SIZE ANALYSIS |
| 7 | BULK DENSITY, MOISTURE CONTENT OF SOIL IN-SITU |
| 8 | DENSITY INDEX |
| 9 | DIRECT SHEAR BOX TEST |
| 10 | TRIAXIAL TEST (UUT) |
| 11 | TRIAXIAL TEST (CDT) |
| 12 | TRIAXIAL UNDRAINED TEST (CUT) WITH PORE PRESSURE MEASUREMENT |
| 13 | PLATE LOAD TEST |
| 14 | PROCTOR's TEST |
| 15 | MODIFIED PROCTOR TEST |
| 16 | PERMEABILITY TEST |
| 17 | CONSOLIDATION TEST |
| 18 | SWELLING PRESSURE TEST |
| 19 | FREE SWELL TEST (DFS) |
| 20 | CBR TEST |
| 21 | FIELD CBR TEST |
| 22 | FINENESS MODULUS TEST |
| 23 | IS CLASSIFICATION (INCLUDING TEST AS PER REQUIREMENT) |
| 24 | UNCONFINED COMPRESSION TEST (UCS) |
NOTE:
1. In addition to above testing charges, service tax @ 12.36% shall be applicable as per prevailing rates.
2. The HOD, Civil Engineering will decided rate for test not mentioned in this list.
3. In case of unusual problems in the tests, the HOD will modify the rates.
4. If the test is to be carried out at the site located outside laboratory, the party/agency provide labour, conveyance, lodging and boarding etc.
5. For field tests, the party / agency will pay rates of visit charges for the staff members and officials in cash. The rates of visit charges per day are as under:
i) Faculty member - Rs.500/- per day
ii) Tech. Assistant/Technician - Rs.300/- per day
iii) Lab. Attendant/Class IV - Rs.200/- per day
| S.NO. | NAME OF TESTS |
| 1 | PLANE TABLE SURVEY INCLUDING LOCATING DETAILS OF FEATURES OF SITE: a) OPEN AREA |
| 2 | CONTOURING SURVEY, INCLUDING DRAWING CONTOURS AT A CONTOUR INTERVAL OF 0.50m, ADOPTING THE GRID SIZE OF 10m x 10m. ORIGINA LDRAWING SHEETS AND PLOTTING SHALL BE DONE AS PER THE CLIENT REQUIREMENTS. |
| 3 | DOUBLE LEVELING FOR ESTBLISHING TEMPORARY B.M. INCLUDING SUPPLYING 3 COPIES OF LIST OF BENCH MARKS WITH DESCRIPTION AND KEY PLAN AND MARKING OF TBM's SHALL BE DONE AS PER REQUIREMENTS. |
| 4 | LEVELING FOR CROSS SECTION AND L-SECTION, PLOTTING TRACING AND SUPPLYING OF ORIGINAL RECORDS: a) FOR 100m INTERVAL |
| 5 | TRAVERSE SURVEY (COMPASS & THEODOLITE) |
| 6 | TRACING AND DEVELOPING AMMONIA PRINTS: a) FOR AMMONIA PRINTS OF TRACING |
NOTE:
1. In addition to above testing charges, service tax @ 12.36% shall be applicable as per prevailing rates.
2. The HOD, Civil Engineering will decided rate for test not mentioned in this list.
3. In special problems such as hilly areas, dense forests involving special skills, extra consumption and expertise the rates will be decided by the HOD, Civil Engineering.
4. In case of unusual problems in the tests, the HOD will modify the rates.
5. If the test is to be carried out at the site located outside laboratory, the party/agency provide labour, conveyance, lodging and boarding etc.
6. For field tests/survey, the party / agency will pay rates of visit charges for the staff members and officials in cash. The rates of visit charges per day are as under:
i) Faculty member - Rs.500/- per day
ii) Tech. Assistant/Technician - Rs.300/- per day
iii) Lab. Attendant/Class IV - Rs.200/- per day
| S.NO. | NAME OF TESTS |
| 1 | LOS ANGLES ABRASION VALUE |
| 2 | AGGREGATE CRUSHING VALUE |
| 3 | AGGREGATE IMPACT VALUE |
| 4 | FLAKINESS INDEX VALUE |
| 5 | SPECIFIC GRAVITY OF AGGREGATE |
| 6 | WATER ABSORPTION OF AGGREGATE |
| 7 | SOUNDNESS TEST OF AGGREGATE WITH Na2SO4/Mg2SO4 SOLUTION (PER 5 CYCLES) |
| 8 | ANGULARITY NUMBER VALUE |
| 9 | DEVELS ABRASION / ATTRITION VALUE |
| 10 | FLOAT TEST |
| 11 | SIEVE ANALYSIS OF AGGREGATE |
| 12 | BITUMEN STRIPPING VALUE |
| 13 | DUCTILITY VALUE |
| 14 | PENETRATION VALUE |
| 15 | SOFTENING POINT VALUE (RING AND BALL TEST) |
| 16 | VISCOSITY VALUE OF TAR/BITUMEN |
| 17 | SOLUBILITY |
| 18 | SPECIFIC GRAVITY OF BITUMEN |
| 19 | MARSHALL STABILITY TEST |
| 20 | 10% FINES VALUE |
NOTE:
1. In addition to above testing charges, service tax @ 12.36% shall be applicable as per prevailing rates.
2. The charges for preparation of sample will be Rs.500/- extra.
3. The tests will be as per IS procedures.
4. The HOD, Civil Engineering will decided rate for test not mentioned in this list.
5. In case of unusual problems in the tests, the HOD will modify the rates.
6. If the test is to be carried out at the site located outside laboratory, the party/agency provide labour, conveyance, lodging and boarding etc.
7. For field tests, the party / agency will pay rates of visit charges for the staff members and officials in cash. The rates of visit charges per day are as under:
i) Faculty member - Rs.500/- per day
ii) Tech. Assistant/Technician - Rs.300/- per day
iii) Lab. Attendant/Class IV - Rs.200/- per day
S.NO. |
NAME OF TESTS |
| 1 | PHYSICAL PARAMETERS: a) COLOR |
| 2 | TURBIDITY |
| 3 | pH |
| 4 | ELECTRICAL CONDUCTIVITY |
| 5 | CHLORIDE |
| 6 | ACIDITY |
| 7 | ALKALINITY |
| 8 | TOTAL HARDNESS (CO3, HCO3) |
| 9 | CALCIUM HARDNESS |
| 10 | TEMPORARY HARDNESS |
| 11 | SETTLE SOLIDS |
| 12 | TOTAL DISSOLVED SOLIDS |
| 13 | TOTAL SOLIDS |
| 14 | TOTAL SUSPENDED SOLIDS |
| 15 | IRON |
| 16 | MANGANESE |
| 17 | DISSOLVED OXYGEN |
| 18 | B.O.D. |
| 19 | RESIDUAL CHLORINE |
| 20 | CALCIUM |
| 21 | SULPHATE |
| 22 | NITRATE |
| 23 | SOLUBLE SULPHATE |
NOTE:
1. In addition to above testing charges, service tax @ 12.36% shall be applicable as per prevailing rates.
2. The HOD, Civil Engineering will decided rate for test not mentioned in this list.
3. In case of unusual problems in the tests, the HOD will modify the rates.
4. If the test is to be carried out at the site located outside laboratory, the party/agency provide labour, conveyance, lodging and boarding etc.
5. For field tests, the party / agency will pay rates of visit charges for the staff members and officials in cash. The rates of visit charges per day are as under:
i) Faculty member - Rs.500/- per day
ii) Tech. Assistant/Technician - Rs.300/- per day
iii) Lab. Attendant/Class IV - Rs.200/- per day
| S.NO. | NAME OF TESTS |
| 1 | TENSILE TEST - INCLUDING UNIT WEIGHT, % ELONGATIONAND ULTIMATE TENSILE STRENGTH, UP TO 100 TON LOAD: a) ON METAL RODS, INCLUSIVE OF PREPARATION OF SPECIMENS AS PER IS REQUIREMENT: b) EXCLUSIVE OF PREPARATION OF ROD SPECIMEN i. e. RECEIVED AS PER IS REQUIREMENTS: c) ADD EXTRA FOR 0.2% PROOF STRESS (WITH EXTENSOMETER)d) ON FLATS (70mm WIDE)e) ON: |
| 2 | COMPRESSION TEST: ON TIMBER BLOCKS, STONE BLOCKS, BRICKS, STEEL SECTIONS,& DRILLED HOLES (READY TO SIZE) |
| 3 | FLEXURE TEST: a) ON TIMBER SPECIMENS(READY TO SIZE) UP TO 1.0m SPAN |
| 4 | COLD BEND TEST ON STEEL SECTIONS |
| 5 | IMPACT TEST (CHRPY/IZOD): a) ON PREPARED SPECIMEN |
| 6 | ROCK WELL HARDNESS TES - 3 OBSERVATIONS. |
| 7 | FATIGUE TEST: a) ON SPECIMENS READY TO SIZE |
| 8 | TEST ON BRICKS/ MOSAIC TILES: a) WATER ABSORPTION b) EFFLORESCENCE TEST |
| 9 | DOUBLE SHEAR TEST ON UTM FOR METALLIC BARS (ROUND) SPECIMEN PREPARED AS PER IS CODE: a) UP TO 25MM b) ABOVE 25MM |
| S.NO. | NAME OF TESTS |
| 1 | FLY ASH - PHYSICAL AND CHEMICAL TESTS AS PER IS: 3812 a) 45 MICRON RESIDUE (WET ---- SIEVE ANALYSIS) |
| 2 | MICRO - SILICA - a) S1O2 DETERMINATION |
| 3 | COMPRESSIVE STRENGTH OF CONCRETE/MORTAR CUBES (FOR A SET OF THREE CUBES) |
| 4 | NORMAL CONSISTENCY OF CEMENT |
| 5 | INITIAL SETTING TIME OF CEMENT |
| 6 | FINAL SETTING TIME OF CEMENT |
| 7 | FOR ALL THREE TEST NO. 4, 5, & 6 AS ABOVE |
| 8 | COMPRESSIVE STRENGTH OF CEMENT (INCLUDING CASTING) |
| 9 | SIEVE ANALYSIS OF CEMENT (90 MICRON) |
| 10 | SIEVE ANALYSIS OF FINE AGGREGATES |
| 11 | SIEVE ANALYSIS OF COARSE AGGREGATES |
| 12 | FINENESS MODULUS OF AGGREGATES |
| 13 | BULKING OF SAND |
| 14 | PERCENTAGE OF VOIDS TEST FOR AGGREGATE |
| 15 | SOUNDNESS TEST OF CEMENT |
| 16 | SPECIFIC GRAVITY OF CEMENT / SAND / AGGREGATE |
| 17 | TEST FOR WORKABILITY OF CONCRETE (SLUMP TEST/VEE-BEE TEST/FLOW TABLE TEST) |
| 18 | WATER ABSORPTION OF CUBES / AGGREGATES |
| 19 | MODULUS OF RUPTURE OF CONCRETE BEAMS |
| 20 | CRUSHING TEST OF AGGREGATE INCLUDING PREPARATION OF SAMPLE |
| 21 | MODULUS OF ELASTICITY DETERMINATION OF CONCRETE (IS CODE METHOD) |
| 22 | DELETERIOUS SUBSTANCE IN - a) FINE AGGREGATE |
| 23 | SPLIT TENSILE STRENGTH TEST |
| 24 | SOUNDNESS TEST OF AGGREGATE WITH Na2SO4/Mg2SO4 SOLUTION (PER 5 CYCLES) |
| S.No. | Name of Agency & address | Title |
| 1 | The Resident Engineer, RHB Division - III, Kota | SBC (Garonda Scheme) at Ramganjmandi |
| 2 | The Executive Engineer, UIT, Kota | Crust Design (Kunhari) |
| 3 | M/s Agarwal Brothers, Ratlam | SBC (RCC-OHT) at Kota Junction |
| 4 | M/s Horizon Projects & Infrastructure | SBC of Multi Storey Building at Nayapura |
| 5 | The Executive Engineer, UIT, Kota | Foundation Design at J. K. Pavallion, Kota |
| 6 | The Resident Engineer, RHB Division, Baran | SBC (Garonda Scheme) at Baran |
| 7 | The Executive Engineer, PHED, Distt. Divn, Kota | SBC (OHSR) at Dongarali |
| 8 | The Executive Engineer, Water Resources Divn-II, Chhabara | SBC (Earthan Dam) at Hindlot |
| 9 | The Secretary, UIT, Kota | Widening of Mala Road |
| 10 | The Secretary, UIT, Kota | Checking of Foundation Design at J. K. Pavallion |
| 11 | The Executive Engineer (Const) WCR, Kota | SBC for Road under Bridges |
| 12 | The Assistant Engineer, PWD Division-II, Jhalawar | Concrete Mix Design M25 grade |
| 13 | The Assistant Executive Engineer, West Central Railway, Kota | Concrete Mix Design M25 & M20 grade FOB |
| 14 | M/s S. P. Equipments & Services, Kota | Proof Checking of Civil Foundation of Gas Exhuster |
| 15 | The Executive Engineer, PHED, Bundi | Rehabilitation of RCC-SR, Gudanathawatan |
| 16 | The Executive Engineer, PHED Division, Bundi | Proof Checking of Design & Drawing RCC-SR 260KL at Thikarda |
| 17 | The Executive Engineer, (Civil-IV) KTPS, RVUNL, Kota | Health Assessment of OHT at Vidhyut Nagar, Banswara |
| 18 | The Executive Engineer, Chambal Project Division, Kota | Turning Point Structure at RD 914.40 of Alnia Dam |
| 19 | The Executive Engineer, PHED Division, Ramganjmandi | Proof Checking of design & drawing RCC-OHT 325KL at Kanwas |
| 20 | The Executive Engineer, PHED Division, Ramganjmandi | Proof Checking of design & drawing RCC-SR 200KL at Satalkheri |
| 21 | The Assistant Engineer, PWD Sub Division, Atru | Consultancy for Tech. Advice for High level Bridge across river Parwan on SH-51 in Km 94 |
| 22 | The Executive Engineer, PHED Division, Ramganjmandi | Proof Checking of design & drawing of RCC-OHT 125KL at Udpura-Morak |
| 23 | The Executive Engineer, PHED Division, Ramganjmandi | Proof Checking of design & drawing of RCC-OHT 150KL at Masan Ka Bara - Suket |
| 24 | The Executive Engineer, PHED Division, Ramganjmandi | Proof Checking of design & drawing of RCC-OHT 150KL at ASI Colony - Suket |
| 25 | The Executive Engineer, Bisalpur Division-V, Ajmer | Proof Checking of design & drawing of CWR & Pump House 1100KL at Kishangarh |
| 26 | The Executive Engineer, Bisalpur Division-V, Ajmer | Proof Checking of design & drawing of CWR & Pump House 2000KL at ARAIN |
| 27 | M/s Mohd. Construction Co., Kota | Proof Checking of design & drawing of RCC-Top Slab Batheli Irrigation Project, Chhabara |
| 28 | The General Manager, Punj Lloyd Limited, Bijolia | Consultancy for Rock Investigation at Ch. 338.00 |
| 29 | The Executive Engineer, RSAMB, Kota | Remidial Measurement for Ceiling Plaster of Shops of Fruit & Vegitable Market |
| 30 | The Executive Engineer, PHED Division, Ramganjmandi | Proof checking of design & drawing of RCC-OHT 160KL at Satalkheri |
| 31 | The Executive Engineer, PHED Division, Baran | Inspection of OHSR of Village Bambori Kalan (Mangrol) |
| 32 | M/s Jai Mata Di Contractor c/o SE, PHED, Bisalpur Project | Proof Checking of design & drawing of RCC-OHSR 50KL at Ren & 230KL at Bandanwara |
| 33 | M/s Water Power Engineering Enterprises, New Delhi | Proof Checking of design & drawing of CWR&PH 4000KL at Kali Dungari |
| 34 | The Assistant Division Engineer, West Central Railway, kota | Proof Checking of design & drawing of steel column of shed for Track Machine |
| 35 | M/s Power Grid Corporation of India Limited, Kota | Consultancy for Technical opinion of Spur (Stud) for Arresting Erosion of River Bank |
| 36 | M/s Ugrsen Gupta, Contractor & Engineers, Kota | Proof Checking of Design & Drawing of RCC-OHT 250KL at Tegore Nagar, Kota |
| 37 | M/s Ugrsen Gupta, Contractor & Engineers, Kota | Proof Checking of Design & Drawing of RCC-OHT 175KL at Tegore Nagar, Kota |
| 38 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing of RCC-OHSR 350KL at Lakheri |
| 39 | The Executive Engineer, PHED Distt. Division, Kota | Proof Checking of Design & Drawing of RCC-OHT 120KL at Dungarli-Morkhudana (Pipalda) |
| 40 | M/s L & T C/o Prject Director, NHAI, PIU (E/W), Kota | Concrete Mix Design M30 & M35 grade |
| 41 | The Assistant Divisional Engineer, West Central Railway, SWM | Consultancy for Assessment of Cement Concrete Ratio |
| 42 | Sr. Site Engineer, SRC Projects Pvt. Ltd., Chhitorgarh | Concrete Mix Design M25 grade |
| 43 | The Vice President, MIT, Kota | Concrete Mix Design M30 grade for proposed site of Hospital at Kota |
| 44 | M/s Tata Projects Ltd., Chanderia (Chittorgarh) | Concrete Mix Design M20 & M25/M30 (with superplastisizer/pumpable) |
| 45 | M/s GEA Energy System (I) Ltd. | Concrete Mix Design M25 with Superplasticsizer |
| 46 | M/s S. P. Equipments & Services, Kota | Proof Checking of Civil Foundation of Gas Exhuster |
| S.No. | Name of Agency & address | Title |
| 1 | Rani Construction Pvt. Ltd. | CNS Mix Design |
| 2 | The Resident Engineer, RHB Division-I, Chhipa Barod | SBC (EWS Houses) |
| 3 | M/s Chhotelal Contractor, Dadabari Extension, Kota | SBC ( RCC-OHT) at Durgpur, Jhalawar |
| 4 | The Secretary, Swajal Dhara Paijal Yojana, Bhandaheda | SBC |
| 5 | M/s Loddha Construction Co., Kota | SBC (Talera Godown) |
| 6 | M/s Shri Ram Construction Group, Kota | SBC (RCC-OHT) at Railway Station, Kota |
| 7 | M/s Vastu Vedik Colonizers, Kota. | SBC (Housing Scheme) at Baran Road, Kota |
| 8 | The Resident Engineer, RHB Division-I, Kota. | SBC (Garonda Scheme) |
| 9 | The Executive Engineer, PHED,Baran | SBC (RCC-OHT) at Bohat & Siswali |
| 10 | The Executive Engineer, PWD Distt. Divn., Kota. | SBC (ITI Building) at Khairabad |
| 11 | The Executive Engineer - IV, UIT, Kota | SBC (Harbal Park) NH-12, Bundi Road,Kota |
| 12 | The Executive Engineer, PHED, Bundi | SBC (RCC-OHT) at Thikarda |
| 13 | The Resident Engineer, RHB Division-I, Kota | Pavement Design |
| 14 | The Executive Engineer, Water Resources Divn., Kota | SBC (Kaithoon-Balapura Lift Project) |
| S.No. | Name of Agency & address | Title |
| 1 | The Executive Engineer, UIT, Kota | Rigid Pavement Design Mala Road |
| 2 | M/s Punj Lloyd Limited, Chittorgarh | Design of Rockfill Embankment NH-76 |
| 3 | M/s S. S. & Sons, Malviya Nagar, Jaipur | SBC |
| 4 | M/s HCC Ltd., C/o Stanley Rites, Chittorgarh | Fly Ash Embankment Design |
| 5 | M/s Ugrsen Gupta, Engineers & Contractors, Kota | SBC (OHSR) Dungarja, Digod |
| 6 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing RCC-OHT 100KL |
| 7 | M/s Gajendra Agarwal, Vaishali Nagar, Ajmer | Proof Checking of Design & Drawing RCC-CWR 1500KL |
| 8 | M/s Triveni Enterprises, Kota | Proof Checking of Design & Drawing GLSR 145KL |
| 9 | The Executive Engineer, PHED Division, Jhalawar | Use of PCC for Water Retaining/ Building work |
| 10 | M/s Triveni Enterprises, Kota | Mix Design M-25 grade concrete |
| 11 | M/s Punj Lloyd Limited, Chittorgarh | Proof Checking of Design of minor bridges at ch.343.730 |
| 12 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing of RCC-CWR 120KL |
| 13 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing of RCC-OHT 390KL |
| 14 | The Executive Engineer, PHED Division, Ramganjmandi | Rehabilitation of RCC-OHT 130KL at Khairabad |
| 15 | The Executive Engineer, PHED Distt Rural Dn., Kota | SBC of RCC-OHT 225KL at Char Chouma |
| 16 | M/s Prem Construction Co., Jaipur | SBC of RCC-OHT 10.50KL at Swami Vivekanand Nagar |
| 17 | M/s Chhotelal Contractor, Kota | Proof Checking of Design & Drawing of RCC-CWR 100KL |
| 18 | M/s Shri Ram Construction Group, Kota | Proof Checking of Design & Drawing of RCC-OHT150KL |
| 19 | M/s Laxmi Nath Infrastructure (Pvt) Ltd., Churu | Mix Design M-40 grade Concrete |